This project aims to improve efficiency by converting the existing single cycle power plant (Gas Turbine Power Plant – PLTG) into a combined cycle power plant (Gas and Steam Power Plant – PLTGU) through the utilization of exhaust heat. The waste heat is processed to produce steam that drives a steam turbine, generating additional electricity. As a result, the emission intensity (kgCO₂eq/kWh) is significantly reduced.
Registry Number
VER-11-PR-XII-2024-16141
Activity Period
January 2023 – December 2043 (252 months)
Implementation Status
Ongoing
Project Owner
PT. Pembangkitan Jawa Bali – Muara Tawar Unit (Private Sector)
Address: Jl. PLTGU Muara Tawar No. 1, Segara Jaya Village, Taruma Jaya District, Bekasi Regency, West Java Province – 17218
Price: Start from $12.07/tCO2e